Skip to content

North Dallas handyman · Same week scheduling, often within days · Fully insured

Teddy TouchupsSmall fixes to full remodels.

General contracting

When it's bigger than a touchup.

Bathrooms, kitchens, tile and built ins, led by Eddy and his 40+ years of home remodeling experience. One point of contact from the first walkthrough to the final wipe down.

Tony usually answers. If not, he texts you back the same day.

Remodeled primary bathroom with a navy double vanity, a glass walk in shower and a freestanding soaking tub
Primary bath remodel

What we take on

How a bigger project starts

  1. 1

    Eddy walks the project with you

    He looks at what you've got, asks how you use the space, and tells you what's worth doing and what isn't.

  2. 2

    We plan it out in the truck

    Eddy and Tony walk the whole project through and price every line item. No price talk at your kitchen table.

  3. 3

    Your estimate arrives in minutes

    Texted and emailed, usually before Eddy leaves your street. Take your time deciding.

  4. 4

    Same crew, start to finish

    Permits pulled, the schedule set, and the people you met doing the work.

Some of our bigger projects

Our own work, every one. No stock photos.

Remodeled primary bathroom with a navy double vanity, a glass walk in shower and a freestanding soaking tub
Primary bath remodel
Kitchen with a white marble look waterfall island, wood cabinets and a vaulted beamed ceiling
Waterfall island kitchen
Frameless glass walk in shower with large format marble panels and matte black fixtures
Marble walk in shower
Custom built in cabinets and trim, work in progress
Built ins, mid job
Kitchen with a large plaster range hood on carved corbels over a decorative tile backsplash
Custom range hood
Dining room with floor to ceiling picture frame wall molding and a crystal chandelier
Paneled dining room

See all our workBathroom remodel cost guideKitchen remodel cost guide

Bigger project questions

How much does a bathroom remodel cost?

Most land between $8,000 and $75,000 or more. A same layout refresh runs about $8,000 to $18,000, a tub to shower conversion $10,000 to $30,000, and a full primary bath gut $35,000 to $75,000 and up.

How much does a kitchen remodel cost?

Typically $20,000 to $150,000 or more depending on scope. Our kitchen remodel cost guide breaks it down by tier.

Is the walkthrough free?

Yes. For bigger projects Eddy comes out, walks it with you, and your written estimate is texted and emailed, usually within minutes. No charge and no pressure to sign.

Do you pull permits?

Yes. Remodels that touch plumbing or electrical need a city permit. We pull it, manage it and schedule the inspections. Licensed trade partners handle plumbing and electrical work, as Texas requires.

Can a small job turn into a bigger one?

All the time. Plenty of clients meet us on a touchup visit and call us back for the bathroom. Same team, same standard, whichever size job it is.

Let's take a look at your project.

Call (817) 328-8333 or send us the details. Eddy comes out, and your written estimate arrives within minutes.

Estimate requests are free, no pressure. Tony texts you back the same day.

Get my estimateCall now